UPVC管件注塑模具
UPVC Pipe Fitting Injection Mould: Overview and Key Considerations UPVC (Unplasticized Polyvinyl Chloride) pipe fittings are widely used in plumbing, irrigation, and industrial fluid transport systems due to their durability, chemical resistance, and cost-effectiveness. The production of these fittings relies heavily on injection moulding, a high-efficiency manufacturing process that ensures precision, consistency, and scalability. Below is a detailed description of UPVC pipe fitting injection moulds, covering design, material selection, manufacturing processes, and quality control. 1. Mould Design and Structure The injection mould for UPVC pipe fittings is typically made from high-grade tool steel or hardened alloys to withstand high pressure and temperature during production. The mould consists of several critical components: - Cavity and Core: These define the internal and external shapes of the fitting. The cavity forms the outer surface, while the core shapes the inner diameter. - Runner System: Channels that guide molten UPVC from the injection machine nozzle to the mould cavities. - Cooling System: Integrated water or oil channels to regulate mould temperature and ensure uniform cooling, minimizing warpage. - Ejection Mechanism: Pins or plates that release the solidified fitting from the mould after cooling. Design considerations include wall thickness uniformity, draft angles for easy ejection, and gate placement to avoid flow marks or weld lines. 2. Material and Processing Parameters UPVC is a rigid thermoplastic with high melt viscosity, requiring precise control during injection moulding: - Temperature: The barrel temperature typically ranges between 170°C and 210°C, while the mould is maintained at 30°C–60°C to prevent premature cooling. - Injection Pressure: High pressure (800–1,500 bar) is needed to fill the mould completely due to UPVC’s low flowability. - Cycle Time: Depends on fitting size and thickness but usually ranges from 20 to 60 seconds. 3. Manufacturing Process 1. Material Preparation: UPVC pellets are dried to remove moisture, which can cause defects like bubbles. 2. Injection: Molten UPVC is injected into the closed mould under high pressure. 3. Cooling: The mould remains closed until the part solidifies. 4. Ejection: The fitting is ejected, and any excess material (flash) is trimmed. 5. Post-Processing: Some fittings may require threading or surface treatment. 4. Quality Control Critical quality checks include: - Dimensional Accuracy: Verified using calipers or CMM (Coordinate Measuring Machine). - Pressure Resistance: Hydrostatic testing ensures leak-proof performance. - Visual Inspection: Surface defects like sink marks or discoloration are examined. 5. Advantages of Injection Moulding for UPVC Fittings - High Production Efficiency: Suitable for mass production with minimal waste. - Precision and Consistency: Ensures tight tolerances and repeatability. - Complex Geometries: Allows intricate designs like elbows, tees, and reducers. Conclusion Injection moulding is the preferred method for manufacturing UPVC pipe fittings due to its efficiency, precision, and scalability. Proper mould design, material handling, and process optimization are essential to producing high-quality fittings that meet industry standards for durability and performance. Advances in mould technology continue to enhance production speed and reduce costs, further solidifying UPVC fittings' role in modern piping systems.
产品
分类:
-
U-PVC三通管件模具
所属分类: UPVC管件模具浏览次数: 567编号:发布时间: 2025-10-28 21:57:28U-PVC三通管件模具模具名称:U-PVC三通管件模具腔体:2个腔体模具尺寸:75mm模具钢:型腔和型芯采用德国2316、中国2316或4cr13登机口:直接登机口模具结构:油缸型芯/型腔硬度:真空热处理后HRC 40-45°度注塑机:320T PVC注射问题及解决方法1、缺料:管件注塑过程中经常会出现无法充满模具的现象。注塑机刚开始工作时,由于模具温度太低,PVC熔融料热损失大,易产生早期凝固,模腔阻力大,材料不能充满模腔。这种现象很正常,也是暂时的,连续注入数字模型后就会自动消失。如果始终无法充满模具,请考虑以下情况并进行适当调整: 1:注射料温度低,流动性差,可适当提高加热温度,以改善材料的塑化和流动性。2:设定注塑周期短,或材料不足,可适... -
UPVC斜四通管件模具
所属分类: UPVC管件模具浏览次数: 584编号:发布时间: 2025-10-30 21:15:18UPVC斜四通管件模具模具名称:UPVC 斜交四通管件模具腔数:1腔模具尺寸:110mm模具钢:型腔和型芯采用德国2316、中国2316或4cr13登机口:直接登机口模具结构:油缸型芯/型腔硬度:真空热处理后HRC 40-45°度注塑机:450T 台州市黄岩宏进模具有限公司成立于2002年。我们专业设计和制造管件模具超过23年。我们期待与您的长期合作。以下是主要信息,供大家参考。常问问题:1.你的最小起订量是多少?1套就可以了2.你们的交货时间是多少?交货时间约为 60-75 个工作日。3.什么是装运港?MOLD船到宁波或上海港都可以。4.你们的付款条件是什么?我们接受提前 40% T/T,发货前余款 60% TT5.我该如何联系您?您可以通过电子邮件、whatsapp 或微信联系我常...
新闻
分类:
-
[Company News]客户合影
2025-09-23 15:20:39
案例
分类:
视频
分类:
暂无搜索结果!
下载
分类:
暂无搜索结果!
招聘
分类:
暂无搜索结果!
推荐产品
暂无搜索结果!






Whatsapp
电话